TWINNING PROJECT
|
|
Component 3 – Activity 4.5
Provisional programme of Training
Background
Component 3: Development of Procedures and Manuals
Activity 3.1 Make revisions and/or deletions of the SAA existing procedures and manuals together with the elaboration of new tools (procedures, manuals, inspector handbook, data bases, IT systems etc) in Certification, Design & Production: JAR 21, JAR 25
Activity 3.2 Make revisions and/or deletions of the SAA existing procedures and manuals together with the elaboration of new tools (procedures, manuals, inspector handbook, data bases, IT systems etc) in Airworthiness Directives: JAR 39
Activity 3.3 Make revisions and/or deletions of the SAA existing procedures and manuals together with the elaboration of new tools (procedures, manuals, inspector handbook, data bases, IT systems etc) in Certifying Staff: JAR 66
Activity 3.4 Make revisions and/or deletions of the SAA existing procedures and manuals together with the elaboration of new tools (procedures, manuals, inspector handbook, data bases, IT systems etc) in Training: JAR 147
Activity 3.5 Make revisions and/or deletions of the SAA existing procedures and manuals together with the elaboration of new tools (procedures, manuals, inspector handbook, data bases, IT systems etc) in Maintenance: JAR 145
Activity 3.6 Make revisions and/or deletions of the SAA existing procedures and manuals together with the elaboration of new tools (procedures, manuals, inspector handbook, data bases, IT systems etc) in Flight Operations: JAR OPS 1-3
Activity 3.7 Make revisions and/or deletions of the SAA existing procedures and manuals together with the elaboration of new tools (procedures, manuals, inspector handbook, data bases, IT systems etc) in Flight crew / STD: JAR FCL – STD
Activity 3.8 Make revisions and/or deletions of the SAA existing procedures and manuals together with the elaboration of new tools (procedures, manuals, inspector handbook, data bases, IT systems etc) in Aerodromes certification: ICAO manual certification of aerodromes
Component 4a: Implementation and Training
Activity 4.5 Provide training for SAA Personnel with respect to theoretical and practical training in Ukraine, of all SAA personnel who are concerned with the new elaborated tools
Methodology
The activities will be carried out by visiting experts, and their work will be coordinated by the STEMs. The experts will give short lectures, coach on the job and organise workshops. During the workshops, the attendees will be asked to answer to specific problems related to the implementation of the JARs. At the end of each module of training, the attendees will be asked to write a short report to the RTA about its benefit, in order to assess the course, and propose a number of changes in procedure or processes of his/her job with adequate arguments for supporting the ideas. Each module of training will help the SAA personnel in elaborating its procedures and manuals. At the end of the training in Ukraine, the STEs will check the parts of the procedures and manuals written by the SAA personnel related to their field.
At the end of the training, a workshop will be organized within departments,
in which a representative will present shortly the training received and the
procedures elaborated.
Planning of activities
|
Dates |
OPS |
FCL |
21-25 |
145 |
66/147 |
|
|
|
|
|
|
|
|
14/01 to 18/01 |
ENAC | ||||
|
21/01 to 25/01 |
ENAC | ||||
|
28/01 to 01/02 |
|
|
|
|
|
|
04/02 to 08/02 |
|
|
|
|
|
|
11/02 to 15/02 |
|
|
|
|
|
|
18/02 to 22/02 |
|
|
Basic Regulations and Certification Process Andrzej Kardymowicz |
|
|
|
25/02 to 29/02 |
EASA Assessment visit | ||||
|
03/03 to 07/03 |
Parts A, B and C AOC delivery based upon documentation approval (operating manual, quality manual, maintenance manual..) French DGAC: organisation of the supervision (headquarters, local offices) Inspector's handbook Airline's structure (designated post holders) Tristan Sers + Henryk Krasowski |
|
|
|
Detailed presentation of JAR-66 & Conversion of national licenses to JAR- 66 licenses Preparation of Conversion Report Examinations credits Preparation of Credit Report Tomasz Grzegorczyk |
|
10/03 to 14/03 |
10/03 – Non working day in Ukraine | ||||
|
17/03 to 21/03 |
RVSM, MNPS, Low visibility operations, precision and non precision approaches, Cabin Crew, OPS Parts E and O (2 + 2 days) Benoit Jeannin + Olivier Fages
|
JAR/FCL 1,2,3,4 rules: General presentation (including SMS) Plan to implement the JAR/FCLs, transitional rules with regards to present regulations (2 days) Theoretical examinations Programmes and rules (3 days) Isabelle Petroff + JF Brysbaert |
|
|
|
|
Environment (Alain Depitre) A) Noise certification :
B) Activities in ICAO groups on noise certification (Authorities, manufacturers…) C) Operational noise on airports: the “Balance approach”: (source noise reduction, operational procedures, land use planning, restrictions)
D) Engine emission certification (ICAO Annex 16, Volume 2 presentation; Chapters and Appendices) E) Trade-off between noise and emission F) Emission trading G) Operational restriction for emissions H) Activities in ICAO emission groups |
|||||
|
24/03 to 28/03 |
23-24/03 Easter in France and Poland | ||||
|
31/03 to 04/04 |
Parts J and D, ETOPS, weight and balance, operating procedures (2 days) Performance, limitations OPS Parts F, G, H and I (3 days) JM Lapene + Yves Bienvenu |
|
|
|
|
|
|
Airports Joel Heurlin (DCS) + Pierre Thery (STAC) detailed rule presentation (ICAO annex 14, French regulation)
Certification and surveillance
|
||||
|
07/04 to 11/04 |
|
|
Regulations pertaining certification of design Organisations Design Organisation Approval (DOA) - Products and Changes to Products Design Organisation Approval (DOA) - Parts and Appliances Andrzej Kardymowicz |
General: ICAO Annex VI maintenance requirements Continuous Airworthiness Requirements in JAA/EASA system Part M maintenance conceptions Arkadiusz Lisek |
|
|
14/04 to 18/04 |
Flight Crew OPS Part N, All weather operations (AWO OPS), |
|
|
|
|
|
21/04 to 25/04 |
|
Medical: Conditions for aero medical examiners, Conditions for aero medical centres Medical standards (3+2 days) Rene Germa + Prof. Carlioz |
Regulations Pertaining Production Production without the Production Organisation Approval Production Organisation Approval for Products, Parts and Appliances Certificates of Airworthiness for Aircraft Andrzej Kardymowicz |
|
Certification of JAR-147 organizations Certification process Staff qualifications Organizational requirements Certification documents Examinations Tomasz Grzegorczyk |
|
28/04 to 02/05 |
National holidays in Ukraine | ||||
|
05/05 to 09/05 |
09/05: National holiday in Ukraine | ||||
|
12/05 to 16/05 |
OPS 3 specificities against OPS 1 Mireille Chabroux
|
|
|
JAR/Part 145 Section A requirements detailed presentation Role of Quality system in MOA Human Factor in maintenance Idea, structure and contents of MOE Surveillance system of MOAs – Section B requirements #FF6666 |
|
|
19/05 to 23/05 |
|
Licensing: Requirements to issue a licence, class and type ratings, IR and instructor ratings Licence format Evidences to require and contain of a pilot file. Question of data base’s development Elodie Monath |
Imported Products, Parts and Appliances and Changes designed in Non-JAA Countries Changes to Type Certificates Certificates of Airworthiness for Imported Aircraft, Parts and Appliances Andrzej Kardymowicz |
|
|
|
26/05 to 30/05 |
STD (addressed in OPS and not in FCL), equipment OPS Parts K and L, (3 days), MEL (1 day) Bruno Haller |
|
Joint Technical Standard Order Authorisations JTSO Authorisations for Import – Applicability Standard JTSO Authorisations Identification of Products and Parts Andrzej Kardymowicz |
|
|
|
02/06 to 06/06 |
|
FTO/TRTO Flight training organisations approvals Detailed rules presentation Implementation of the regulation by a FTO and a TRTO Surveillance of the approved training organisations: methods and guides Stephane Martin |
NA |
|
|
|
09/06 to 13/06 |
|
|
NA |
|
|
|
16/06 to 20/06 |
ICAO Audit | ||||
|
23/06 to 27/06 |
ICAO Audit | ||||
|
30/06 to 04/07 |
Closing (SAA only) Operating manual: study and final approval Audit guidance/Methods Airline's continued surveillance Rejane Lavenac + Henryk Krasowski (4 days 01-04/07) |
Practical examinations: Skill tests and proficiency checks: requirements, flight examiner manual Examiners: standardisation, supervision and nomination Xavier Portier (4 days 01-04/07) |
|
|
|
|
07/07 to 11/07 |
|
|
|
Part M Structure, contents and applicability of requirement Basic AW obligations of aircraft owner/operator Subpart G CAMO approval as part of AOC Conception of CAW Management in general aviation Subpart F maintenance ARC as part of CofA Surveillance system of CAMOs – Section B requirements Fleet monitoring system Arkadiusz Lisek |
|
|
14/07 to 18/07 |
|
|
CS E: General piston, turbines engines (design and construction, type substantiation), environmental and operational design requirements; Acceptable Means of Compliance JAR Airworthiness Directives: general and content, application and responsibilities Francis Fagegaltier (3 days 15-17/07) |
|
|
|
21/07 to 25/07 |
Transport of dangerous goods and Security OPS Part R and S Jo Le Tonqueze |
|
CS 25: Airworthiness code (description explanation), Acceptable Means of Compliance, AWO (CS AWO) 2 days |
|
|